Home
>
Company
>
Clients
Ceramics
Case Study 1:
Complete DC evaluation, delivering a full gap analysis
upon all warehousing activities; PSL identified
potential productivity gains of over 30%. This was
supported by presentations to local management and the
workforce.
Case Study 2:
Various projects, including process and methods
improvement, machine monitoring and justification,
design engineering and work study.
Case Study 3:
Tectime work measurement to assist in the maintenance
of incentive schemes within a highly labour intensive
environment – directly lead to the recruitment of a PSL
consultant.
Case Study 4:
PSL Pace Rating clinics and on-site productivity
awareness training.
Case Study
5:
Numerous
work measurement investigations, to establish standard
times for a range of operations within various
departments. Methods and best practices assignments
within Departments, including Mould Making, Lithography
& Dipping House.

|